Sign In | Join Free | My
Sussman Machinery(Wuxi) Co.,Ltd
Sussman Machinery (Wuxi) Co., Ltd.
Home > Double Layer Roll Forming Machine >

18 Roller Stations Double Layer Roll Forming Machine Steel Thickness 0.3 - 3.0 mm

Sussman Machinery(Wuxi) Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Sussman Machinery(Wuxi) Co.,Ltd
City: Wuxi
Province/State: Jiangsu
Country/Region: China
Tel: 86-136-0619-3016
Contact Person:
Miss Spring Wu

18 Roller Stations Double Layer Roll Forming Machine Steel Thickness 0.3 - 3.0 mm

Brand Name : Suhang
Model Number : SH-DL
Certification : CE, ISO, SGS
Place of Origin : China
MOQ : 1set
Price : USD 36000-60000 per set
Payment Terms : L/C, T/T
Supply Ability : 10 sets/ month
Delivery Time : 60 working days after accepting the advanced payment
Packaging Details : Standard package with film, plastic and steel wire. (or customized)
Power supply : 380V, 50Hz, 3Phase (customized)
Dirve system : 1.2 inc single chain drive
Control system : PLC system
Material : Galvanized steel
Hydraulic station power : 4KW
Forming station : Normally 18
Contact Now

Roof and wall panel double layer roll forming machine

Technical Parameter

1. Plate Material: Galvanized steel

2.Thickness: 0.3-3.0 MM

3. Forming Stations: Normally 18 stations

4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome

5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining

6. Driven System: Chain Driven 1.2 inches chain with longer shafts

7. Main Power with reducer: 7.5KW

8. Cutting: Hydraulic Cutting Cr12mov

9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62

10. Hydraulic Station Power: 4KW

11. The whole machine is controlled by industry computer-PLC.

12 PLC--Panasonic, Japan English and Chinese Language

13. Touch Screen--Panasonic Japan

14. Encoder--Omron, Japan

15. Electric parts--Schneider

16. Outline of main about 4000mm*1350mmm*1200mm

17. Weight : about 12 tons

Main Components

Serial No.

Commodity & Description


5T manual De-coiler


Leveing guiding


Servo feeding device


Main roll forming machine


Hydraulic station


Cutting device


Finished products tabel


PLC control system


Out tables


Spare parts

Working Flow of Roll Forming Machine

Uncoiling—Feeding&Leveling--Roll forming—Cutting—Products collecting

Photo gallery

Customer Visiting

Loading picture

After-sale Serive

-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 6 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 4 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.

Product Tags:

Slip Roll Forming Machine


Metal Roofing Roll Forming Machine

China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

18 Roller Stations Double Layer Roll Forming Machine Steel Thickness 0.3 - 3.0 mm Images

Inquiry Cart 0
Send your message to this supplier
Enter your email please.
To: Sussman Machinery(Wuxi) Co.,Ltd
Characters Remaining: (0/3000)